Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 19 results ...

Cattell, D W, Bowen, P A and Kaka, A P (2011) Proposed Framework for Applying Cumulative Prospect Theory to an Unbalanced Bidding Model. Journal of Construction Engineering and Management, 137(12), 1052–9.

Cheung, S O and Chow, P T (2011) Withdrawal in Construction Project Dispute Negotiation. Journal of Construction Engineering and Management, 137(12), 1071–9.

Edwards, D J and Holt, G D (2011) Mini-Excavator Safety: Toward Innovative Stability Testing, Procurement, and Manufacture. Journal of Construction Engineering and Management, 137(12), 1125–33.

Eybpoosh, M, Dikmen, I and Talat Birgonul, M (2011) Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling. Journal of Construction Engineering and Management, 137(12), 1164–75.

Fonte, G C A (2011) Energy Management Reduces Great Pyramid Build Effort by More Than 98%. Journal of Construction Engineering and Management, 137(12), 1195–204.

Golparvar-Fard, M, Peña-Mora, F and Savarese, S (2011) . Journal of Construction Engineering and Management, 137(12), 1099–116.

Gouett, M C, Haas, C T, Goodrum, P M and Caldas, C H (2011) Activity Analysis for Direct-Work Rate Improvement in Construction. Journal of Construction Engineering and Management, 137(12), 1117–24.

Hartmann, T (2011) Goal and Process Alignment during the Implementation of Decision Support Systems by Project Teams. Journal of Construction Engineering and Management, 137(12), 1134–41.

  • Type: Journal Article
  • Keywords: Information technology (IT); Implementation; Three-dimensional models; Consulting services; Construction management; Configuration; Decision support systems; Information technology; Implementation; Three-dimensional models; Consulting services; Constructi
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000389
  • Abstract:
    Despite the significant amount of work in recent years to better understand the implementation of technologies in project-team settings, the research community still lacks an in-depth understanding of the social dynamics around the implementation of a new technology to support decision-making tasks at the operational project-team level. To increase this understanding, this paper presents a longitudinal case study about the implementation of a four-dimensional (4D) decision support system by a project team. This paper provides a grounded analysis of the observations from this study. The analysis shows that the implementation of the 4D system was characterized by a constant negotiation about the goals of the implementation and the process of how to best implement the 4D system. During these negotiations actors applied their technical and project task related knowledge to analyze, understand, and influence the goals and the process of the implementation. This knowledge, however, changed throughout the implementation and hence, the goals and processes of the implementation also changed frequently. On the basis of these findings, this paper suggests that construction management theory and practice should account for the possibility of shifting goals and processes during technology implementations.

Heon Jun, D and El-Rayes, K (2011) Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling. Journal of Construction Engineering and Management, 137(12), 1080–8.

Kale, S and Karaman, E A (2011) Evaluating the Knowledge Management Practices of Construction Firms by Using Importance–Comparative Performance Analysis Maps. Journal of Construction Engineering and Management, 137(12), 1142–52.

Kirgiz, M S (2011) Chemical Properties of Blended Cement Pastes. Journal of Construction Engineering and Management, 137(12), 1036–42.

Li, J and Zou, P X W (2011) Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects. Journal of Construction Engineering and Management, 137(12), 1205–9.

Li, N and Becerik-Gerber, B (2011) Life-Cycle Approach for Implementing RFID Technology in Construction: Learning from Academic and Industry Use Cases. Journal of Construction Engineering and Management, 137(12), 1089–98.

Li, Y Y, Chen, P, Chew, D A S, Teo, C C and Ding, R G (2011) Critical Project Management Factors of AEC Firms for Delivering Green Building Projects in Singapore. Journal of Construction Engineering and Management, 137(12), 1153–63.

Love, P E D, Edwards, D J, Irani, Z and Goh, Y M (2011) Dynamics of Rework in Complex Offshore Hydrocarbon Projects. Journal of Construction Engineering and Management, 137(12), 1060–70.

Nahmens, I and Bindroo, V (2011) Is Customization Fruitful in Industrialized Homebuilding Industry?. Journal of Construction Engineering and Management, 137(12), 1027–35.

Swarup, L, Korkmaz, S and Riley, D (2011) Project Delivery Metrics for Sustainable, High-Performance Buildings. Journal of Construction Engineering and Management, 137(12), 1043–51.

Xia, B, Chan, A P C and Yeung, J F Y (2011) Developing a Fuzzy Multicriteria Decision-Making Model for Selecting Design-Build Operational Variations. Journal of Construction Engineering and Management, 137(12), 1176–84.

Zhou, H and Zhang, H (2011) Risk Assessment Methodology for a Deep Foundation Pit Construction Project in Shanghai, China. Journal of Construction Engineering and Management, 137(12), 1185–94.